First page Back Continue Last page Summary Graphic
ADC2 Schedule
During the 10 day run:
- 5 days with HPSS
- 5 days with CASTOR
- 4 days with level 3 filter (2 with each MSS)
Maximum data base size:
- 8.6 TB/d -> 43 TB/MSS -> 86 TB/ADC
- We will be happy with 40-50 TB
Stay tuned !
Notes: